Skip to content

Intermediate programme

Equipment and Process Functions in the Cementing Industry: Part (3)

Part three: the cement side. Finish grinding, additions, storage, packing and despatch.

Duration
5 days
Level
Intermediate
Next date
2 to 6 November 2026
Fee from
US$995live online

Read the programme brochure

ClassroomLive onlineIn house

Overview

The final part covers everything after the cooler. Finish grinding systems and separators, the handling and dosing of gypsum and supplementary materials, cement silos and the segregation and flow problems they produce, and the packing and despatch equipment where product finally meets a customer. Bulk loading and the weighing accuracy that underpins invoicing are included, because an error there is a commercial problem rather than a technical one.

It runs 7 times over the published calendar, in 6 cities and live online. Every date is the same programme with the same content and the same certificate.

What you will be able to do

  • Describe each major cement side machine and its function.
  • Explain additions handling and dosing accuracy.
  • Identify silo flow and segregation problems and their causes.
  • Assess packing and loading equipment performance.
  • Maintain weighing accuracy through to invoicing.

Who should attend

Cement mill and despatch personnel, maintenance staff on the cement side, process engineers, and logistics and commercial staff who depend on despatch equipment.

Is the level right for you?

This is an intermediate level programme. It assumes you are working in or moving into the area it covers, and it is built around your own material rather than a case study. If you are unsure, ask an advisor before registering rather than after.

Ask an advisor

How it is taught

Short input, then work. Across 5 days of roughly 6 teaching hours each, the balance sits deliberately with the second: a programme where the trainer talks for six hours produces notes rather than capability.

  • Your own material

    Exercises run on situations delegates bring, not on a case study written for a different organisation in a different decade.

  • A capped cohort

    Small enough that everybody is asked something. Executive programmes are capped tighter still.

  • Practice under scrutiny

    The difficult conversation, the challenged assumption, the decision defended out loud. Judgement is not built by watching.

  • Something to take back

    Each day ends with a thing you can use on Monday rather than a slide deck you will not reopen.

The programme, day by day

Day 1Finish grinding

Finish grinding

  • Mill systems on cement duty
  • Separators and product control
  • Cooling and conditioning of product
Day 2Additions

Additions

  • Gypsum, slag, fly ash and limestone handling
  • Dosing systems and accuracy
  • Storage, moisture and flow
Day 3Storage

Storage

  • Silo types and discharge systems
  • Segregation, bridging and ratholing
  • Aeration and silo cleaning safety
Day 4Packing

Packing

  • Rotary packers and bag handling
  • Weight accuracy and rejects
  • Palletising and bag quality
Day 5Despatch

Despatch

  • Bulk loading systems
  • Weighbridges and calibration
  • Dust control at loading points

What you leave with

  • An equipment register for the cement side.
  • A silo and flow problem diagnosis.
  • A despatch performance and accuracy review.

The certificate

A GATI certificate recording what you attended, issued after the programme has run and attendance has been taken. Attending at least 80 per cent of the days earns a certificate of completion; attending less earns a certificate of attendance stating exactly what was attended.

Every certificate carries a code that anybody can check against GATI's own record, which is what makes it worth holding. It records participation. This site will not imply one it does not have.

Questions

Who is Equipment and Process Functions in the Cementing Industry: Part (3) for?
Cement mill and despatch personnel, maintenance staff on the cement side, process engineers, and logistics and commercial staff who depend on despatch equipment. It runs at intermediate level within Cement Manufacturing, so it assumes you are working in or moving into that area rather than meeting it for the first time. If you are unsure whether the level fits, ask an advisor before registering rather than after.
How long is it, and what does a day look like?
5 days, running to roughly 6 teaching hours a day. Sessions are built around your own material rather than a case study, so a day alternates between short input and working on something you brought. The full outline is on this page, day by day.
What does it cost, and what is included?
The next published date is Live online at US$995 per delegate. The fee covers tuition, all programme materials and the certificate. Travel, accommodation and visas are arranged by the delegate. Fees vary by city, and every published date shows its own.
Can it be delivered for my organisation only?
Yes. Any published programme can run as a private cohort, on dates that suit you, in your city or online, built around your own material. That is a different conversation from registering an individual, and it starts with what capability you are trying to build rather than with a course title.
What certificate do I get?
A GATI certificate recording what you attended, issued after the programme has run and attendance has been taken. Attending at least 80 per cent of the days earns a certificate of completion; attending less earns a certificate of attendance stating exactly what was attended. Every certificate carries a code that anybody can check against GATI's own record.
Is the online version the same programme?
Yes. The same faculty, the same material, the same cohort cap and the same certificate. It is not a recording and it is not a reduced version. It exists because travel budgets and visa timelines rule people out of a room they should be in. The classroom version runs in Nairobi, Dubai, Durban, Maseru.

Want to take this further?

Register on a published date, or tell an advisor what you need and they will come back with something specific rather than a brochure.

Related subjects

Related programmes

All of Cement Manufacturing
  • Cement Manufacturing

    Blended Cement Operation and Process Techniques

    Producing blended cements: material selection, grinding strategy and the quality control they demand.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1
  • Cement Manufacturing

    Cement Factory Maintenance and Optimisation

    Maintaining a cement plant for availability, and finding the optimisation that maintenance work makes possible.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1
  • Cement Manufacturing

    Cement Manufacturing Training Programme

    A structured grounding in cement production for operators and technicians who run the plant day to day.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1
  • Cement Manufacturing

    Cement Manufacturing Typical Incidents Part (2)

    Part two: process incidents. Kiln upsets, blockages, cooler failures and the chains of events behind them.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1
  • Cement Manufacturing

    Cement Manufacturing Typical Incidents Part (3)

    Part three: safety and environmental incidents, including the confined space and hot material events that kill.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1
  • Cement Manufacturing

    Energy Efficiency Saving in Cement Industry

    Finding and capturing energy savings in a cement plant, thermal and electrical, with the numbers to prove them.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1
  • Cement Manufacturing

    Environmental Impact of Cement Industry

    The environmental footprint of cement manufacture, its measurement, and what actually reduces it.

    Next
    2 Nov 2026
    From
    US$995live online
    Duration
    5 days
    Level
    Intermediate
    Delivery
    ClassroomLive online+1