Skip to content

Programme brochure

Laid out for A4. Back to the programme

Download as a PDF
GATIGLOBAL AXIS TRAINING INSTITUTE

Cement Manufacturing

Cement Plant Operations

Fundamentals of Cement Manufacturing Technology

The whole cement process from quarry to despatch, for people who need the complete picture once.

Duration
5 days
Contact hours
30
Level
Foundation
Fee from
On enquiry

Overview

Cement plants are long, hot and interconnected, and somebody who only knows their own section will keep being surprised by it. This week builds the process end to end: raw materials and quarrying, raw meal preparation, pyroprocessing, clinker, grinding and despatch. It explains why the plant is built the way it is, what each stage is trying to achieve chemically, and where a decision in one area shows up as a problem in another.

Who should attend

New process and production engineers, maintenance and electrical staff wanting the process context, laboratory and quality personnel, and commercial or support staff at cement companies.

What you will be able to do

  • Follow the process from raw material to bagged product.
  • Explain what each stage contributes chemically and physically.
  • Name the major equipment and what it is for.
  • Relate a problem in one area to its cause in another.
  • Use the plant's vocabulary correctly.

How it is taught

Short input, then work, across 5 days of roughly 6 teaching hours each. Exercises run on situations delegates bring rather than on a case study written for a different organisation. Cohorts are capped so that everybody is asked something.

Available as classroom, live online, in house.

Programme outline

Day 1

Raw materials

  • Limestone, clay, corrective materials and their chemistry
  • Quarrying, crushing and prehomogenisation
  • Raw mix design and the moduli

Day 2

Raw meal

  • Raw grinding systems
  • Drying, classification and fineness
  • Blending and homogenisation

Day 3

Pyroprocessing

  • Preheater, calciner and kiln
  • Burning zone and clinker formation
  • Cooling, and why cooling rate matters

Day 4

Cement

  • Clinker, gypsum and additions
  • Finish grinding and separation
  • Fineness, strength and setting

Day 5

The plant as a system

  • Energy balance in outline
  • Emissions and dust control
  • Storage, packing and despatch

What you leave with

  • A process flow diagram you have drawn and can explain.
  • A mass and energy picture of a typical line.
  • A list of the interactions that most often cause trouble.

Dates and fees

DatesLocationFormatFee
23 to 27 November 2026Cairo, EgyptClassroomUS$1,500
30 November 2026 to 4 December 2026Accra, GhanaClassroomUS$1,500
7 to 11 December 2026Dubai, United Arab EmiratesClassroomUS$1,500
14 to 18 December 2026Durban, South AfricaClassroomR15,000

Fees are per delegate and cover tuition, all programme materials and the certificate. Travel, accommodation and visas are arranged by the delegate. Registration closes two weeks before a programme starts.

Certificate

A GATI certificate recording what was attended, issued after the programme has run and attendance has been taken. Attending at least 80 per cent of the days earns a certificate of completion; attending less earns a certificate of attendance stating exactly what was attended. Every certificate carries a code that anybody can check against GATI's own record.

It records participation. and GATI does not claim one it does not hold.

Register or ask

Register at globalaxistraining.co.za/courses/fundamentals-of-cement-manufacturing-technology, or ask a programme advisor through the contact page.

Global Axis Training Institute. Dates and fees in this brochure were current on 30 October 2026. The published calendar on the website is always the current one.