Skip to content

Programme brochure

Laid out for A4. Back to the programme

Download as a PDF
GATIGLOBAL AXIS TRAINING INSTITUTE

Cement Manufacturing

Cement Plant Operations

Equipment Operation in the Cementing Industry: Part (1)

Operating plant equipment correctly: start up, running, shut down and the judgement in between.

Duration
5 days
Contact hours
30
Level
Intermediate
Fee from
On enquiry

Overview

Equipment fails earlier when it is operated badly, and most of that is sequence and judgement rather than carelessness. This week covers correct operation of the major machines: the start up and shut down sequences and why the order matters, the parameters to watch while running and what a drift in each means, and the decision of when to stop a machine rather than nurse it. Isolation and permit practice is covered because it is where operation hands over to maintenance.

Who should attend

Plant operators and field technicians, shift supervisors, maintenance staff who operate equipment during testing, and trainers running operator programmes.

What you will be able to do

  • Start up and shut down major equipment in the correct sequence.
  • Monitor the parameters that indicate developing trouble.
  • Decide when to stop a machine rather than continue.
  • Carry out isolation and handover to maintenance correctly.
  • Record operating information a following shift can act on.

How it is taught

Short input, then work, across 5 days of roughly 6 teaching hours each. Exercises run on situations delegates bring rather than on a case study written for a different organisation. Cohorts are capped so that everybody is asked something.

Available as classroom, live online, in house.

Programme outline

Day 1

Before starting

  • Pre start checks and permissives
  • Lubrication and cooling confirmation
  • Area clearance and communication

Day 2

Starting and running

  • Sequence, and why order matters
  • Loading up and reaching stable operation
  • Parameters to watch and their normal ranges

Day 3

Judgement

  • Drift, step change and alarm
  • Nursing a machine against stopping it
  • Escalation and who decides

Day 4

Stopping

  • Planned shut down sequences
  • Emergency stops and their consequences
  • Cooling, turning and post stop care

Day 5

Handover

  • Isolation and lock out
  • Permit to work
  • Defect reporting and shift logs

What you leave with

  • Start up and shut down sequences for your own equipment.
  • An operator watch list per machine.
  • An isolation and handover procedure.

Dates and fees

DatesLocationFormatFee
23 to 27 November 2026Kampala, UgandaClassroomUS$1,500
30 November 2026 to 4 December 2026Dubai, United Arab EmiratesClassroomUS$1,500
7 to 11 December 2026Durban, South AfricaClassroomR15,000
14 to 18 December 2026Nicosia, CyprusClassroomUS$1,500

Fees are per delegate and cover tuition, all programme materials and the certificate. Travel, accommodation and visas are arranged by the delegate. Registration closes two weeks before a programme starts.

Certificate

A GATI certificate recording what was attended, issued after the programme has run and attendance has been taken. Attending at least 80 per cent of the days earns a certificate of completion; attending less earns a certificate of attendance stating exactly what was attended. Every certificate carries a code that anybody can check against GATI's own record.

It records participation. and GATI does not claim one it does not hold.

Register or ask

Register at globalaxistraining.co.za/courses/equipment-operation-in-the-cementing-industry-part-1, or ask a programme advisor through the contact page.

Global Axis Training Institute. Dates and fees in this brochure were current on 30 October 2026. The published calendar on the website is always the current one.