Overview

Cement grinding is the largest single electrical consumer on most plants and the place where product quality is finally set. This week covers the system types in use, their operating logic and where each struggles, then goes to operation: stable running, product changeovers, temperature and gypsum dehydration, and the grinding aids that help and the ones that mostly cost money. Troubleshooting is organised by symptom, because that is how problems present.

Who should attend

Grinding system operators and supervisors, process and energy engineers, maintenance planners for mill systems, and quality staff.

What you will be able to do

  • Compare ball mill, vertical roller mill and roller press systems honestly.
  • Operate a system stably through changeovers and load changes.
  • Control mill temperature and gypsum dehydration.
  • Assess specific energy consumption and improve it.
  • Work from a symptom back to its cause.

How it is taught

Short input, then work, across 5 days of roughly 6 teaching hours each. Exercises run on situations delegates bring rather than on a case study written for a different organisation. Cohorts are capped so that everybody is asked something.

Available as classroom, live online, in house.

Programme outline

Day 1

Systems

  • Ball mill circuits
  • Vertical roller mills
  • Roller presses and combined systems
  • Choosing between them for a given product

Day 2

Operation

  • Stable operation and the levers available
  • Product changeovers
  • Feed composition and its effect on grinding

Day 3

Temperature and sulphate

  • Mill temperature control
  • Gypsum dehydration and its consequences
  • Water injection and cooling

Day 4

Energy

  • Specific energy consumption benchmarking
  • Grinding aids and their real effect
  • Where energy is actually lost

Day 5

Troubleshooting

  • Vibration in vertical mills
  • Blaine and strength mismatch
  • Throughput loss, and working back to its cause

What you leave with

  • A system performance assessment.
  • A changeover procedure that protects quality.
  • A symptom based troubleshooting guide.

Dates and fees

DatesLocationFormatFee
23 to 27 November 2026Durban, South AfricaClassroomR15,000
30 November 2026 to 4 December 2026Cape Town, South AfricaClassroomR15,000
7 to 11 December 2026Cairo, EgyptClassroomUS$1,500
14 to 18 December 2026Kampala, UgandaClassroomUS$1,500

Fees are per delegate and cover tuition, all programme materials and the certificate. Travel, accommodation and visas are arranged by the delegate. Registration closes two weeks before a programme starts.

Certificate

A GATI certificate recording what was attended, issued after the programme has run and attendance has been taken. Attending at least 80 per cent of the days earns a certificate of completion; attending less earns a certificate of attendance stating exactly what was attended. Every certificate carries a code that anybody can check against GATI's own record.

It records participation. and GATI does not claim one it does not hold.

Register or ask

Register at globalaxistraining.co.za/courses/cement-grinding-and-milling-systems-process-operation-and, or ask a programme advisor through the contact page.

Global Axis Training Institute. Dates and fees in this brochure were current on 30 October 2026. The published calendar on the website is always the current one.